Wednesday, September 20, 2017
Authors Posts by The Masterbuilder Bureau

The Masterbuilder Bureau

1399 POSTS 1 COMMENTS

Strategized Formwork Solution for Maximisation of Profit

Good formwork systems help to minimize floor to floor construction cycle time, thereby achieving substantial indirect cost saving for the project. Modern formwork systems...

Specifying the Right Floors for Pharmaceutical Facilities

Designing effective infection control practises into the structure and daily operations of a pharmaceutical facility is imperative. Floor finishes are an integral part of...

SEWC 2017

The Structural Engineers World Congress (SEWC), is dedicated to the Art, Science, and Practice of Structural Engineering. SEWC Inc. was chartered and incorporated in...

Relevance of Blended Cement for Enhanced Durability

The Ramco Cements Limited with a production capacity of 16.5 million tonnes per annum has been able to widen its presence in a number...

Sika System Solutions for Watertight Wet Rooms

Today we don't only think it's an area to freshen up or cleaning but actually, it's a private space to relax and refresh. A...